Menu

 

DILG Orders Immediate Structural Inspections in Earthquake-Hit Areas in Cebu and Mindanao

In the wake of the recent series of strong earthquakes in Mindanao and continuing aftershocks affecting Regions VII, XI, and Caraga, the Department of the Interior and Local Government (DILG) has directed all concerned local government units (LGUs) to immediately conduct thorough inspections and structural evaluations of affected buildings, infrastructure, and homes to safeguard lives and prevent further casualties.
 
In its Advisory, the DILG emphasized that LGUs must undertake rapid structural assessments led by Building Officials, Municipal and City Engineers, and other technical personnel. Priority should be given to structures in heavily affected barangays and those reported to have visible cracks, partial collapse, or foundation damage.
 
LGUs are likewise instructed to inspect tilted or displaced buildings and structures affected by ground fissures, sediment venting, and subsidence before allowing reoccupation. Residential structures must also be properly assessed to determine the extent of damage and ensure the safety of occupants.
 
The Department further urged all LGUs, through their Regional Disaster Risk Reduction and Management (RDRRM) Councils, to work closely with DPWH District Engineering Offices, Local DRRM Offices, and Barangay Officials in conducting joint inspections and sharing findings. All efforts must adhere to existing government issuances and protocols on post-earthquake structural evaluation.
 
The DILG stressed that immediate safety actions must be implemented for structures declared unsafe, including the prompt evacuation and relocation of affected families to temporary shelters in coordination with Local DRRM Councils and Municipal Social Welfare and Development Offices (MSWDOs).
 
LGUs are also reminded to expedite the processing and issuance of permits for repair or reconstruction works necessary to rectify earthquake-related damage, ensuring compliance with national safety and engineering standards.
 
President Ferdinand R. Marcos Jr. earlier directed all national agencies to extend urgent assistance to affected areas and fast-track recovery and rehabilitation measures. In line with this, the DILG reaffirmed its full support to all LGUs in ensuring public safety, structural integrity, and swift recovery in quake-affected communities. ###